2nd Floor Walls (Part 1)
Well, after 1 day of rain delay, Andy and the crew were able to start raising the second floor walls.
They had pre-built them last Friday, but had to wait until today to stand them up (they were stored flat under the tarp over the weekend).
Here's Andy, our Swiss/German framing foreman, pondering the map.
View from the living room:
That ridge is going to be WAY up there!
They had pre-built them last Friday, but had to wait until today to stand them up (they were stored flat under the tarp over the weekend).
Here's Andy, our Swiss/German framing foreman, pondering the map.
View from the living room:
That ridge is going to be WAY up there!
0 Comments:
Post a Comment
<< Home